LAX Bid Package News

How are the BidPlus bid packages prepared? 

See a list of mistakes that we have identified and corrected for you in past bid packages.

The current version of BidPlus is 9.0.0.0 is Service Pack 6.

The December Primary bid period is now open. The bids were posted on 11/11 at 1900 PST. The December Primary bid period will be open from 11/12 thru 11/18 at 0800 local time.

Previous Bid Packages Available For Downloading
(Click the Bidding button at the top to download)

(2008)

March
March (rlf)
April
April (rlf)
May
May (rlf)
June
June (rlf)
July
July (rlf)
August
August (rlf)
September
September (rlf)
October
October (rlf)
November
November (rlf)